Which JCIDS document is utilized to build upon the Initial Capabilities Document (ICD) while ensuring key technologies are matured?

Prepare for the DAU Program Management PM Exam with targeted quiz questions. Study using flashcards and multiple choice questions, each complete with hints and explanations. Boost your readiness for the exam!

The Capability Development Document (CDD) is designed to build upon the Initial Capabilities Document (ICD) by detailing the required capabilities that military forces need to address an identified capability gap. The CDD outlines the necessary performance attributes and associated key technologies that need to be matured during the development phase of the acquisition process. This ensures that as the program progresses from concept to production, the necessary key technologies are sufficiently matured and that the capability being developed is fully justified and aligned with the needs of the operational environment.

By establishing a clear linkage from the ICD, the CDD serves to translate broad operational needs into detailed requirements, providing both a foundation for technology development efforts and a framework for integration with defense acquisition processes. This careful attention to technology maturity validates that all elements necessary for successful capability delivery are addressed, thereby reducing risks and increasing the likelihood of successful outcomes in program execution.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy